Peng, F.; Zheng, L. (2023). An improved multi-objective Wild Horse optimization for the dual-resource-constrained flexible job shop scheduling problem: A comparative analysis with NSGA-II and a real case study, Advances in Production Engineering & Management, Vol. 18, No. 3, 271-287, https://doi.org/10.14743/apem2023.3.472