Advances in Production Engineering & Management
Volume 14 | Number 3 | September 2019 | pp 267–402
Contents
Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method
Jiang, C.; Xi, J.T.
https://doi.org/10.14743/apem2019.3.327
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
A blockchain-based smart contract trading mechanism for energy power supply and demand network
Hu, W.; Hu, Y.W.; Yao, W.H.; Lu, W.Q.; Li, H.H.; Lv, Z.W.
https://doi.org/10.14743/apem2019.3.328
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
A novel multiple criteria decision-making approach based on fuzzy DEMATEL, fuzzy ANP and fuzzy AHP for mapping collection and distribution centers in reverse logistics
Ocampo, L.A.; Himang, C.M.; Kumar, A.; Brezocnik, M.
https://doi.org/10.14743/apem2019.3.329
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
Effect of aluminium and chromium powder mixed dielectric fluid on electrical discharge machining effectiveness
Modi, M.; Agarwal, G.
https://doi.org/10.14743/apem2019.3.330
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
Multi-objective scheduling of cloud manufacturing resources through the integration of Cat swarm optimization and Firefly algorithm
Du, Y.; Wang, J.L.; Lei, L.
https://doi.org/10.14743/apem2019.3.331
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
Evaluation of the sustainability of the micro-electrical discharge milling process
Pellegrini, G.; Ravasio, C.
https://doi.org/10.14743/apem2019.3.332
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
A novel approximate dynamic programming approach for constrained equipment replacement problems: A case study
Sadeghpour, H.; Tavakoli, A.; Kazemi, M.; Pooya, A.
https://doi.org/10.14743/apem2019.3.333
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
An integrated system for scheduling of processing and assembly operations with fuzzy operation time and fuzzy delivery time
Yang, M.S.; Ba, L.; Zheng, H.Y.; Liu, Y.; Wang, X.F.; He, J.Z.; Li, Y.
https://doi.org/10.14743/apem2019.3.334
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
Optimal timing of price change with strategic customers under demand uncertainty: A real option approach
Lee, Y.; Lee, J.P.; Kim, S.
https://doi.org/10.14743/apem2019.3.335
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)
Influence of high dynamic range images on the accuracy of the photogrammetric 3D digitization: A case study
Santosi, Z.; Budak, I.; Sokac, M.; Hadzistevic, M.; Vukelic, D.
https://doi.org/10.14743/apem2019.3.336
ABSTRACT (HTML) |
ABSTRACT AND REFERENCES (PDF) |
FULL ARTICLE TEXT (PDF)